How we work // THE FOUR STEPS

What happens, and when.

Four steps, in order, with what you receive at each one. Six to eight weeks from signing to a sealed report.

Every engagement runs the same four steps in the same order. Nothing below is unique to a large property or a small one - the scope changes, the sequence does not.

01 — Scope & proposal

Fixed scope and fee · Days, not weeks

You describe the property - location, type, unit count, and what prompted the call. Robert "Nicko" Romeo, R.S., our Director of Capital Reserve Analysis, reviews every request personally and prices the work before anything starts.

You receive a fixed scope and a fixed fee. No hourly meter, and no change order for work the proposal already described. Fifty percent is due on signing.

  • A written scope naming every common element to be inspected
  • A flat fee, quoted up front
  • The name of the engineer who will do the work

02 — Field inspection

Every common element · On site, by name

A licensed engineer walks the property and documents every common element - roads, roofs, pools, retaining walls, drainage - recording condition, remaining life, and the cost to repair or replace it.

Board members, the property manager, and maintenance staff are asked what actually breaks and what has already been repaired, so the plan reflects how the property is run and not how it looked on inspection day.

  • A photograph tied to every finding
  • Condition and remaining life for each component
  • At Ellison Lakes: 23 funded components

03 — Draft report

For board review · Before it is final

Your board reads the complete report - inventory, condition, cost estimates, and the thirty-year funding model - while questions can still change it.

Comments come back to the engineer who inspected the property, not to an account manager. A further twenty-five percent is due at draft.

  • The full draft, including the 30-year capital reserve budget
  • A review with board members and the property manager
  • Revisions before anything is sealed

04 — Final, sealed report

Under P.E. seal · Six to eight weeks from signing

The report is issued under the seal of the Professional Engineer of Record - signed by the engineer responsible for the property, not by a reviewer who never saw it.

Six to eight weeks from signing, start to finish. The final twenty-five percent is due on delivery.

  • The sealed report, in full
  • A funding plan your board can adopt as written
  • The complete photographic record

Tell us about the property. We'll take it from there.